SPRINT 3 AND EARLIER
Sprint 3 went live 12/12.
wednesday, Dec. 12
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
|
|
|
Arnis |
|
|
|
Cassandra |
|
|
|
Hunter |
|
|
|
Janet |
nothing Thalia |
update help files |
|
Justin |
|
|
|
Qing |
fixed th139 and th406 for sprint 4 |
modify the access control wiki |
|
Robin |
|
|
|
Tuesday
11 December 2007
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
Load testing vs. Alfresco 2.1.1. |
-- |
Other work. |
Arnis |
|
|
|
Cassandra |
Entered a bunch of issues in Jira, started the long task of inserting style headers into testing documents. Loaded Office 2007 into Mac. Makes work easier, sort of. |
Continue working on testing document; follow up on some bugs; test more. |
Have a cold. |
Hunter |
|
|
|
Janet |
|
|
|
Justin |
|
|
|
Qing |
Release to QA |
finish th139 |
|
Robin |
sprint 4 bug fixing -- trying to clear out the easy to fix ones |
review Qing's access control notes |
|
Notes:
Monday December 10
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
Load testing vs. Alfresco 2.1.1. |
Vacation. |
Arnis |
|
|
|
Cassandra |
Finished Upload help section, uploaded to Wiki; tested fixed bugs; reviewed bugs. |
Tested a bunch; figured out how to structure the huge testing document. It will be given a clickable TOC, a navigator view, sections will be moveable - useful for regrouping funtionality areas. |
|
Hunter |
|
|
|
Janet |
|
|
|
Justin |
|
|
|
Qing |
fixed bug TH395 and TH399 |
release to QA |
|
Robin |
Had a breakthrough on extended metadata work over the weekend, should go much more smoothly now |
Merge sprint3 branch back into trunk |
|
Notes:
Friday, December 7
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Arnis |
|
|
|
Cassandra |
worked on Upload help |
finish writing up Upload help, put up on Wiki; write up a couple more suggestions for Upload screen changes; test |
|
Hunter |
|
|
|
Janet |
Reviewed sprint 3 bugs |
none today |
Offsite meeting all day |
Justin |
Fixed a bunch of Sprint 3 issues. |
Finish up artwork issues. |
Working from home today. Trying to prevent getting sick before next week's Kerberos board meeting. |
Qing |
trying to prove to alfesco that the ticket caching problem we are experiencing is a bug on their end |
write up the access control notes |
|
Robin |
|
(worked on SMA, to try and get that off my plate so it wont interfere with thalia) |
|
Notes:
----
Thursday, December 6
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Arnis |
|
|
|
Cassandra |
Did a lot of testing; found bugs; wrote them up |
Plan to work on Upload help file |
|
Hunter |
|
|
|
Janet |
|
|
|
Justin |
Cleaned up a few more artwork issues. |
Finish up all art related issues. |
Multiple meetings to contend with. |
Qing |
alfresco meeting |
more testing |
|
Robin |
sprint 3 bugs |
sprint 3 bugs |
|
Wednesday, Dec. 5
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Arnis |
|
|
|
Cassandra |
|
get instruction from Robin on Snapz Thursday |
|
Hunter |
|
|
|
Janet |
Navigator artwork. |
More navigator artwork. |
|
Justin |
|
|
|
Qing |
fixed th-361 |
alfresco meeting |
|
Robin |
still struggling with extended metadata |
sprint 3 bugs |
|
Tuesday, December 4
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Arnis |
|
|
|
Cassandra |
tested - a lot, looked at test document, downloaded Snapz, |
test new UI, tried out solutions for TOC of test document |
|
Hunter |
|
|
|
Janet |
(Friday) |
nothing |
meetings |
Justin |
Finished major work on navigator. |
Finalize new artwork. |
|
Qing |
branched out the code for sprint 3 and released to QA |
pick up the access control stuff again |
|
Robin |
Friday: |
extended metadata |
|
Notes:
Monday, December 3 - no scrum, Sprint planning instead
Friday, November 30
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Arnis |
|
|
|
Cassandra |
tested uploading with foreign letters - doesn't work, began |
tweak slideshow, review access control wiki, review bug list, |
sick |
Hunter |
|
|
|
Janet |
started roadmap |
check on spider phone in conf room |
|
Justin |
|
|
|
Qing |
another release to QA |
fixed th-333: add free form support in bulk upload with user specified metadata |
alfresco |
Robin |
deployed load time improvements to QA |
finish pulling apart code, for clean release of only free-form tagging |
|
Notes:
----
Thursday, November 28
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Arnis |
|
|
|
Cassandra |
work on slide show, test, reviewed white paper |
build last slide, review test docs from Brian, test bulk uploading with foreign |
need to learn Mac OS |
Hunter |
|
|
|
Janet |
arranged lunch for Monday |
whitepaper |
|
Justin |
|
More navigator. |
|
Qing |
Investigated and fixed bug th-332 |
another release to QA |
alfresco hasn't responded to my ticket yet |
Robin |
finished freeform tagging |
deploy load time improvements to test |
only 4 hrs sleep, not sure how productive I will be today |
Notes:
Wendesday, November 28
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
other work, vacation |
Arnis |
|
|
|
Cassandra |
|
|
|
Hunter |
|
|
|
Janet |
filed a couple JIRA tasks for myself for help pages |
arrange lunch for Monday |
|
Justin |
|
More navigator. |
|
Qing |
mavenized buildthaliadomain utility program |
investigate Brian's bug about images not showing in his libraries |
|
Robin |
Freeform tagging coming along |
Finish up freeform tagging |
|
Notes:
Tuesday, Nov 27
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
other work* * |
Arnis |
|
|
|
Cassandra |
|
|
|
Hunter |
|
|
|
Janet |
|
|
|
Justin |
Navigator |
|
|
Qing |
made a config change which should hopefully fix cassandra's bug |
mavenize buildthaliadomain utility |
sick |
Robin |
Worked on extended metadata, hitting some frustrating road blocks |
free-form tagging (need a break from the extended metadata problems) |
|
Monday, November 26
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
other work |
Arnis |
|
|
|
Cassandra |
|
|
|
Hunter |
|
|
|
Janet |
released new website to live service |
none planned today |
|
Justin |
navigator |
more navigator |
|
Qing |
access control discussion |
investigate more on the bug |
|
Robin |
turkey, stuffing, mashed potatoes |
sprint 3 tasks |
|
Notes:
Thursday and Friday, November 22-23 : Thanksgiving Holiday
Wednesday, November 21
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
other work |
Arnis |
|
|
|
Cassandra |
|
|
|
Hunter |
|
|
|
Janet |
finished web page edits, put up on thalia-test |
taking campus tour this AM to get more pictures of campus for demo |
phoning into Scrum while I walk to tour |
Justin Progress on navigator work. |
|
|
|
Continue navigator work. Qing |
|
|
Sinus infection. Working from home. |
Robin |
access control discussion |
sprint 3 tasks - tagging, some bugs |
|
Notes:
----
Tuesday, November 20
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
Reconfigured continuum deployment builds per Qing's request. |
-- |
other work |
Arnis |
|
|
|
Cassandra |
|
|
|
Hunter |
|
|
|
Janet |
finalized IAP reservation with Brian |
finish editing website pages |
|
Justin |
Vacation |
Continue navigator work |
Possible sinus infection forming. Most likely working from home today. |
Qing |
released to QA |
access control discussion |
|
Robin |
Mostly non-thalia work; discussed access controls some with Qing |
access control discussion |
|
Notes:
Monday, November 19
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
Work on continuum server. |
other work |
Arnis |
|
|
|
Cassandra |
finished a first draft of help section for Uploading, using Brian's outline |
|
|
Hunter |
|
|
|
Janet |
|
|
in a class this AM, will miss scrum |
Justin |
|
|
|
Qing |
training |
another release to QA |
|
Robin |
Did some work on tagging, got pulled away to finish up some SMA (amps legacy tool) work |
Back to the tagging work |
Need to finish up one last thing on the SMA work first |
Notes:
Friday, November 16
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Arnis |
|
|
|
Cassandra |
|
|
|
Hunter |
|
|
|
Janet |
pinged Bryan about IAP reservation; he wasn't available. We'll coordinate later. |
Rearrange help file area in SVN. |
|
Justin |
Nothing Thalia relevant. |
Kerberos. |
|
Qing |
did another release of sprint 3 to QA |
training |
|
Robin |
|
|
|
Notes:
Thursday, November 15
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Arnis |
|
|
|
Cassandra |
Finished edits to Thalia demo web pages |
Reviewing uploading Help page |
|
Hunter |
|
|
|
Janet |
reserved a room in student union for IAP - Thursday January 24, 1-3PM |
working out reservation details with Bryan |
won't be at scrum today- 10:30 meeting across campus |
Justin |
Fixed TH-299, TH-312, TH-313, TH-314 |
Working on Kerberos the rest of this week. |
|
Qing |
access control discussion |
another release to QA |
|
Robin |
|
|
|
Notes:
Wednesday, November 14
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
other work, vacation rest of this week |
Arnis |
|
|
|
Cassandra |
|
Will work on web pages for Thalia demo site. |
|
Hunter |
|
|
|
Janet |
meetings all day, not much accomplished |
tbd - there's lots to do, I haven't planned which to do yet |
planning time |
Justin |
Spent whole day looking into TH-299. Uncovered a lot more bugs, linked off that one. |
Continue working on TH-299 and related bugs. |
|
Qing |
access control discussion with Robin and Brian |
access control discussion |
|
Robin |
Added redirect to "about" page when there is no domain specified |
More access control discussion |
|
Notes:
Tuesday, November 13
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
other work |
Arnis |
|
|
|
Cassandra |
|
|
|
Hunter |
|
|
|
Janet |
put up placeholder page on herme.mit.edu/thalia/about.html so there's something nice for InfoWorld traffic to see |
getting Cassandra settled |
meetings today |
Justin |
Remerged sprint 2 with trunk |
Continue navigator redesign |
|
Qing |
downloaded and tested 2.1.1 |
access control discussion |
|
Robin |
|
|
|
Notes:
Monday, November 12 - Veterans Day Holiday
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
holiday |
Arnis |
|
|
|
Cassandra |
|
|
|
Hunter |
|
|
|
Janet |
|
|
put up placeholder page on herme.mit.edu/thalia/about.html so there's something nice for InfoWorld traffic to see |
Justin |
|
|
|
Qing |
|
|
|
Robin |
|
Catching up on what's been happening |
At 2pm, when I am free to be in public again, I will need to go run around the neighborhood dancing and screaming. Shouldn't take too long. |
Notes:
Friday, November 9
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
other work |
Arnis |
At scrum training |
At scrum training |
|
Hunter |
|
|
|
Janet |
Reviewed Leah's website text - looks good |
when html arrives, put text into pages, check for any problems |
waiting on html design, but expect it today |
Justin |
Started coding navigator redesign |
Trying to make this a Kerberos day |
|
Qing |
distracted by the web service problem |
problem with the UI merge |
|
Robin |
|
|
|
Notes: Web services crisis is taking up a lot of resources. Monday is a holiday.
----
Thursday, November 8
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
Changed doc work target to this sprint; left rest (the real development work) at sprint 3. |
-- |
Other work. |
Arnis |
|
at Scrum training |
|
Hunter |
|
|
|
Janet |
Talked with Leah about website text |
Review the website text Leah sent this morning |
|
Justin |
|
|
|
Qing |
1. talked with Justin about performance improvement for the matrix view |
merge the code & release to QA |
|
Robin |
-- |
back to tagging as best I can |
This week is turning out to be a wash for me. I will do what I can, but do not expect to accomplish a lot. |
Notes:
1. Today's technical meeting is cancelled.
2. Janet will make a page in wiki for Sprint 3 planning. Everybody please revisit his/her tasks and update the page with their priorities.
Wednesday, November 7
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
Other work. |
Arnis |
|
|
|
Hunter |
no thalia |
no thalia |
web services taking priority |
Janet |
talked w/Deanna re: project website and Thalia interface. She returned a new versin of the website. The interface is challenging, but she hoped to have a solution to the design issues last night or today. |
Look at new website design |
At a class this morning, no Scrum. |
Justin |
Resolved a few minor Sprint 3 issues: TH-137, 202, 278. |
More Sprint 3 bits. |
If the new navigator design isn't finalized soon, it should be moved to Sprint 4. |
Qing |
Test the new code in Firefox and found problem with caching and SSL |
talk to Justin about improving perfomance both from the UI and the IME. |
|
Robin |
|
|
|
Notes:
----
Tuesday, November 6
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
Talked with Qing a bunch about current priorities and capabilities for the build system; updated and created a bunch of stuff in Jira. |
Prioritize the aforementioned tasks. |
All meetings, all the time. |
Arnis |
|
|
|
Hunter |
Thalia deploy |
I will still be waiting on Alfresco |
the web services situation is my top priority. |
Janet |
released Sprint 2 to production |
website, if anything |
meeting day |
Justin |
Non-thalia work |
Sprint 3 tasks |
Finding time between meetings |
Qing |
more web service work |
more access control code testing |
|
Robin |
|
|
|
Notes:
Monday, November 5
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
Out. |
Arnis |
|
|
|
Hunter |
|
|
|
Janet |
tried unsuccessfully to reproduce TH-195 |
release tonight - probably 9PM |
need a rollback plan if release doesn't work - where's the current .war file? |
Justin |
All-day Kerberos |
More Kerberos unless needed |
|
Qing |
worked on the mitid web service |
test the access control code to prepare for Tuesday/Wednesday QA release |
|
Robin |
|
|
|
Notes: Brian said the release looks good. He can't close the back end bugs for adding reporting to IME and for tomcat creating multiple sessions; a developer will have to do that.
Friday, November 2
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
Mostly non-Thalia this week. |
Arnis |
|
out |
|
Hunter |
|
nothing today |
|
Janet |
wrote up PSB notes in https://wikis-mit-edu.ezproxyberklee.flo.org/confluence/display/ZEST/10.31.07+meeting+with+PSB . |
Try reproducing a few bugs |
Need Qing to review meeting notes to fill in a few gaps |
Justin |
|
|
|
Qing |
1. updated build doc to reflect recent changes |
really get to the access control stuff |
had to spend time on the web service crash |
Robin |
|
out |
|
Notes:
----
Thursday 1 November 2007
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
Mostly non-Thalia this week. |
Arnis |
|
|
|
Hunter |
|
|
|
Janet |
Visited PSB with Qing. |
Contact MITemps, start paperwork. |
|
Justin |
|
|
|
Qing |
1. PSB meeting |
1. finish the access control stuff |
|
Robin |
|
|
|
Notes:
* Janet will enter JIRA tasks for 1) configuring isda-build1 for front end build and 2) Robin to finish mavenizing front end build
* Brian asked for better bug writing: explicit descriptions for bugs, descriptions of fix so QA knows more about the cause and what to test, and build version that the fix appears in, so he knows the fix was tested.
* Brian also asked that if there are bugs we wish to mark "wont fix" because a larger upcoming feature makes them non-issues, then put a comment in, and assign them to the sprint where the feature that will fix them lives. That way they can stay int he system as placeholders, and be closed when the new feature is in place and they truly are no longer issues.
Wednesday Oct. 31st
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
Mostly non-Thalia this week. |
Arnis |
|
|
|
Hunter |
|
|
|
Janet |
|
Visit PSB. |
|
Justin |
|
|
|
Qing |
1. QA candidate interview |
1. visited the PSB users with Janet |
|
Robin |
|
|
|
Notes:
* No scrum today - everyone has other meetings
----
Tuesday, October 30
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
-- |
-- |
Mostly non-Thalia this week. |
Arnis |
|
|
|
Hunter |
Reverted thalia-dev and thalia-test to Alf 2.0.1 from the (dysfunctional) Alf 2.1E install, provisioned gybe.mit.edu for temporary use as a Thalia IME server for testing against al-dente/al-fresco. |
Largely non-Thalia work, but may work on the backup/restore script and a deploy/cfg mgmt system. |
Waiting on Alfresco to release 2.1.1 and Jody in ASST to get a SAN to me. |
Janet |
interview prep |
interview QA intern |
|
Justin |
|
|
|
Qing |
1. thalia meeting |
1. QA interview |
|
Robin |
|
|
|
Notes:
Monday, October 29 - Sprint planning meeting, no Scrum today
Friday, October 26
|
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
Tweaked Continuum a bit; seems to be doing everything it should, though it's conservative (possibly overconservative) about sending email. |
Maybe some performance testing vs. 2.1. |
The thalia-test group is most appropriate for testing but is not yet running Alfresco 2.1. |
Arnis |
|
|
|
Hunter |
infrastructure meeting w/Jody |
|
|
Janet |
-- |
Release sprint 1? Need to confirm that it happens today; I thought the code freeze was end of day (weekend) |
|
Justin |
made a thumbnail graphic |
|
|
Qing |
add calls to check permission before getting thumbnail/medium/large |
look at alfresco's source code to understand more how they manage their ticket lifetime and make sure that we are handling the ticket cache accordingly |
|
Robin |
|
-- |
out today |
Notes:
----
Thursday, October 25|| Who || Yesterday || Today || Impediments ||
Andrew |
Finished continuum server setup, though infinite tweaks surely remain to be done. |
Run performance benchmark against current backend with Alfresco 2.1. |
Lots of other work. |
Arnis |
|
|
|
Hunter |
In Training (now know what we need for MySQL clustering) |
Testing out 2.1.1 with a Thalia Frontend. Setup 2.1E for install on thalia-test for QA next week. Both will go into tomorrow. |
Time. Inordinate number of meetings. Alfresco. |
Janet |
started reorganizing wiki |
tbd - haven't planned the day yet |
|
Justin |
Finished all remaining sprint 2 issues |
Spending rest of week on Kerberos tasks |
|
Qing |
changed the thumbnail/medium/large permission and modified the url for getting thumbnail |
add calls to check permission before getting thumbnail/medium/large |
|
Robin |
Communicated with Open Laszlo about the impediment to tagging changes |
Upload user confusion bug -- hide the progress bar except for when its uploading, and make it clear that user needs to click the "upload" button when done. |
|
Wednesday, October 24
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
almost nil |
Finish Continuum work. |
1) The only site with meaningful Continuum documentation was being DoS'd all day yesterday. 2) A bunch of non-Thalia quasi-operational stuff came up that needed most of my time. 3) Some much-delayed dental work has become undelayable and will consume an as-yet-unknown portion of my day. |
Arnis |
|
|
|
Hunter |
at training |
at training |
|
Janet |
scheduled intern interview |
may look at website |
at class |
Justin |
|
|
|
Qing |
tickets are cached now and the app seems to function ok |
change the thumbnail permission and modify the item servlet to get thumbnail, large, and medium images. Make sure the performance is acceptable |
|
Robin |
|
|
not feeling well, will be online as much as I can, but likely will be taking naps/breaks |
Notes:
Tuesday, 23 October 2007
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
More continuum debugging. I think I understand how to fix the email and release problems. (Though mostly not a Thalia day.) |
More of the same. |
Bleeding-edgeness of continuum now *very* apparent. |
Arnis |
|
|
|
Hunter |
|
|
|
Janet |
Meet w/Joan about hiring through MITemps |
Contact intern candidate |
Will be at a class during tomorrow's scrum |
Justin |
good progress reducing thalia swf size, committing changes soon |
|
|
Qing |
compared several opensource caching solutions and decided to use ehcache (the one Alfresco uses) |
continue implemeting ticket cache |
|
Robin |
worked on extended metadata; made progress, but also hit significant road blocks |
|
|
Notes:
Monday, October 22
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
Learned more about the continuum server and did more setup work on it; it should now be doing everything we want except for the deployment to thalia-dev. |
Get auto-deployment working and figure out why the mail that should be going out isn't. |
The Continuum documentation is somewhere between bad and nonexistent. (It's very bleeding-edge; this is not unexpected.) |
Arnis |
|
|
|
Hunter |
Got Alfresco to cluster correctly w/ 2.1.1 and replication and index caching working correctly between al-fresco and al-dente. The Alf, Inc. suggested method of dropping the new .WAR file in place and restarting fell down and went boom. Ended up also bringing in a bunch of the new, rewritten, restructured config files to mix with the 'old' ones from 2.1E. Many things moved from fringe config files to the core ones. Should have the thaliaAdmin and guestUser accounts with default passwds, if anyone wants to play with them. |
Testing al-fresco/al-dente with a Thalia front end. May not get to set that up until later today, and really working on it until tomorrow night. |
Alfresco. |
Janet |
In touch w/Leah about site. |
Meet w/Joan about hiring through MITemps |
Contacting candidate - our schedules don't overlap well for the next few days. |
Justin |
|
|
|
Qing |
1. fixed out a bug on tagging code to allow deletion of all tags on an item |
continue coding on access control |
not sure how caching ticket will work. lots of questions need to be answered, like how to avoid race condition and how to close connection so the alfresco session will not be left open. (the caching code needs to be both fast and robust) |
Robin |
|
|
Have to go get blood drawn at some point, so will be out for an hour and a half or so |
Notes:
Friday, October 19
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
fixed build server problem |
continuing to look at 2.1 clustering |
homedir dropped offline yesterday |
Arnis |
TOS |
help Brian from Questcon with Mingle |
|
Hunter |
2.1 enterprise upgrade, seemed to work |
little details from upgrade; troubleshooting clustering |
Alfresco documentation leaves a lot to be desired, does not help with troubleshooting or configuration, only architecture. Arnis will ask during call; if tech staff available at that time, will join call |
Janet |
Looked at rough drafts from Leah and Deanna |
put together mockups, making it into a cohesive page |
Roz availability - she was working on something more important yesterday |
Justin |
resizing images |
|
no libraries on thalia-dev |
Qing |
meetings |
investigating thumbnail access control problem |
|
Robin |
not in today |
|
|
----
Thursday, October 18
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
Set up Continuum and Thalia autobuilds on new build server. |
Continue work on same; email notifications and svn-triggered builds. |
Meetings. |
Arnis |
|
|
|
Hunter |
|
|
|
Janet |
communicated w/Leah about website |
communicate w/Leah and Deanna about website if needed |
- |
Justin |
1. More reducing load time and general complexity of UI |
1. Continue with load time issue. |
|
Qing |
1. resolved bug#s: 231, 178, 118 |
1. work on locking down access to thumbnails |
|
Robin |
|
|
Not feeling well |
Wednesday, 10/16
Who |
Yesterday |
Today |
Impediments |
---|---|---|---|
Andrew |
Nothing |
Deploying build system. |
|
Arnis |
Made some Jira changes, and started to try the new triage method. Sent some e-mails and had a hall discussion with folks involved in the MIngle licensing. |
Today: will be following up on our TOS issues, and writing up the release e-mail, and seeing if we need to triage the bugs already assigned to "Talia 1.0" in Jira, and get them assigned to sprints. |
Working from home in the afternoon. |
Hunter |
|
|
|
Janet |
1. Mailed web site skeleton to Deanna and Leah. |
1. Made this page. |
|
Justin |
1. talked to deanna about getting rid of tabs in the navigator |
1. continue fixing bugs |
|
Qing |
1.meetings |
1. test the dangling category problem against 2.1 |
|
Robin |
1. meetings |
1) Start with sprint 2 tasks that are bug fixes |
|
Notes: Qing is working with Bryan to set up daily conference call.