Tasks labeled with different letters are in principle independent and can be pursued in parallel.
Label |
Task |
InCharge |
Dependency |
Milestones |
Status |
TargetDate |
Remarks |
---|---|---|---|---|---|---|---|
A1 |
TPC calibration |
Joe |
*when calib is good enough?\\*run test prod of 1 daq file per run\\*request full official production |
|
|
|
eval effi at CM |
A2 |
electron reco effi |
Justin |
*TPC calib\\ *Embedding |
*study effic uniformity vs eta, phi \\ *tracking effic after final calib (tracks crossing CM?) |
|
|
|
B1 |
simu , simple Pythia |
Jan |
*ETOW slow simu in BFC |
*repeat simu of all types of events |
DONE, private production |
Finished: 8/17/2010 |
table below, more W->tau have be added |
B2 |
simu w/ embedding |
Jan & Joe |
*simple simu as reference\\ *TPC calib |
* approval of W embedding\\*one 40 GeV ET electron embedded correctly\\*private 1K various Pythia events\\ *full suit of Pythia events embedded officialy |
|
|
Jan focus on code, Joe on approvals \\*redo time stamp list |
C |
abs. BTOW calib |
Justin +TBD? |
*TPC calib\\ *Pythia simu \\ *single ele MC |
*Leakage study from simu\\ *E/p from high ET electrons |
single ele MC produced -> studying leakage |
Leakage study by 8/23 |
*study linearity? \\ *why E/P~1 for QCD bckg \\ *use BSMD? |
D |
abs. luminosity |
Ross |
none |
*f(old)>f(new)>f(perfect) \\ *stable fit \\ *updated starnote |
first milestone done -- 20%,5%,~2%. \\*First milestone broken, then fixed: 25%>10%>(<1%). Propagating changes through the note. |
*fit function working by 8/3 (need ~1 more day) \\ *starnote updated by 8/10 |
|
E |
write paper |
Joe & Scott |
none |
*draft detailed outline\\ *decide on figures |
|
outline available by 8/9 |
should paper include spin-dependent issues? |
F |
write STAR Note |
Justin |
none |
*preliminary outline |
|
preliminary outline by 8/10 |
|