Assembly Procedures for the Hermes II Avionics Tower
Materials
Allen Key '.077'
Allen Key 'approx. 1/16' (Marked with tape)
Stanley Allen Key set key 15 (Marked with tape)
Small Flathead screwdriver
Small File
Pink Tape Small Phillips Head
Zip Ties
lock tight epoxy
Procedures
Independent Assembly of the Tower
Put Heat Set inserts in all PLA Parts except the GPS holder (pre-integration)
Attach all electronics to the outer face plates as shown in CAD
Screw down all flight electronics to their respective places (ensure that screws face outward edge of rocket body)
Assemble the switch and secure it into place
Attach the flight hardware electrical leads to the switch
- Wire electrical leads to the flight hardware
- Attachment of Cameras by securing the holders to the Camera face plates
Attach the battery holders to the two outer face plates
Run the power cables to near the battery holders and fix them down using (TBD)
- Epoxy all bolts
- When placing tower into end-cap slots ensure that the pyxida panel is on the face with the upper clocking mechanism (i.e. the block of PLA ) on the payload bulkhead
- Ensure that there are no extra stressors or strains due to over screwing or part misalignment with the panel
(For reference see pictures below)
(^^^ AV assembly from Hermes III - 12/8/19)
Notes from last integration (Hermes II ?):
Standoff to panels
flight computers to panels- wire electrical lead
switch- electrical leads
battery + battery holder attach to panels- Leads to switch
camera- holders- plates
plates- ends
Notes from Last integration (Hermes III - 12/8/19)