...
Independent Assembly of the Tower
Attach all electronics to the outer face plates
Screw down all flight electronics to their respective places
Pyxida center
Telemega left
MARSA right
Wire electrical leads to the flight hardware
Assemble the switch and secure it into place
Attach the flight hardware electrical leads to the switch
Attach the battery holders to the two outer face plates
Run the power cables to near the battery holders and fix them down using (TBD)
Attachment of Cameras by securing the holders to the Camera face plates
Securing of the top base plate to the payload bulkhead
Secure the piston through it
(Allow Payload team to secure nose cone electronics)
Attach assembled tower to the attached base plate on the payload bulkhead around the piston