The following is a non-exhaustive (wish)list of areas we could cover (and modifications we could make) during future lab clean-ups.
Areas for future clean-ups
- Go over the blue tool drawers and organize/clean them up
- Revise small drawer cabinets on the corner of the lab
- Free hoist points for the kayaks for winter storage
- what to do with old kayaks?
Modifications
- Redo power & ethernet cabling on the side of the tank and install cable raceways
- Hoisting point on the side of the tank