Overview
A potential goal for the 2018-2019 MIT Rocket Team is to fly two of it's previous designs on SRAD propulsion in a two stage configuration. This design would be capable of 250,000 ft + in altitude and require either Spaceport America or Black Rock as a launch site.
Stage 1
The first stage vehicle would be a rebuild of Project Hermes. The 5.5:1 Von Karmen nose cone would be replaced with a conic transition section containing a staging mechanism. The first stage would fly on a P motor.
Stage 2
The second stage would be a modified version of Project Virgo. It would be loaded with a version of OW-98-FIN1 #1 with the 2018-2019 Propellant stretched by approximately 14 inches. The second stage would require additional TPS.
Proposed Schedule
Summer 2018
-things
Fall 2018
Build Stage 1. The build will maintain maximum commonality with Hermes 1 for heritage and expediency.
Begin developing a staging mechanism.
Develop Cherry Limeade propellant
Launch Pad repairs
Stretch Goals:
Impliment SCAD AARDs
Construct S1 Main parachute
Winter 2018
Complete Stage 1.
Successfully demonstrate an 8 grain P motor with >= 70kNs impulse
Begin developing a 0-back pressure ignition system.
Stretch Goal:
Avionics Bay revision 2
Spring 2018
Build Stage 2
Invent TPS - baseline Inco caps bolted to composite primary structure.
Successful static fire 6G 98 finocyl motor.
9-3-2018 Meeting
Evaluate other launch sites
Go/No-Go after flight test
Mojave Air and Spaceport
June 22, Launch
RasAero for vehicle
Add SVN
RasAero2 tutorial
Particle or Heat Smoke Detectors