You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Diane, Juan met in RT Lab

To Dos ( 2/20/2019):

  • Research interference between sensors (look at noise, accuracy), vibrations (including strength of FG) for first look at distancing
  • Map sensor locations
  • Look into mapping during nose cone layup (easier with two separate halves)
  • Look into location of payload stack in CAD to find where the DAQ interfaces with the thermocouples relative to the base of the nose cone
  • Determine wire length for thermocouples to cut, the shorter the wire the more accurate reading (less resistance), reduce mass, reduce load
    • Consider cable management system (looping wire near the DAQ, calibrate for extra resistance)
  • Vibe Test
    • Test different locations 
    • Criteria: noise, accuracy
  • Consider internal camera for performance for future scientific payloads

2/23/2019:

  • First experiment will test 0 degree angle shift between two layers of 3 TC's, X inches apart
  • Potential Wiring Strategies:
    • Single continuous loop, across different contours
  • No labels