This page will serve as the site of postflight analysis for Hermes Flight 1.
Avionics
Payload
Propulsion
Recovery
Piston Deployment
Firing Force
Comparison with Ground Test
Parachute Drag Coefficients (Effective)
Drogue
Main
Parachute Shock Loads
Drogue
Main
Structures
Integration
Integration began at roughly 1:30 pm PST and the rocket arrived on the pad at roughly 3:00 pm PST.
Lessons Learned
- Having a good checklist would have been beneficial, even though we likely wouldn't have been able to integrate the rocket in the amount of time that we were given before the end of the launch window if we had been following a strict checklist.