Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migration of unmigrated content due to installation of a new plugin

 

Image Modified 

Team

 Team MLB Spring

2020  

2020   Image Modified



 

Information

 

Contact: mlb2020@mit.edu

Meet the Team: Intro Slides

Team Members

NameEmailRoleQuarantine Time Zone

Devon Goetz

dkgoetz@mit.eduTeam Lead
Enrique Montasemontas@mit.eduTechnical Lead
EDT
Zack Kopsteinkopstein@mit.eduCommunications LeadEDT
Claire Wichmancwichman@mit.eduTeam MemberCDT
Simran Pablasimmyp@mit.eduTeam Member

Technical Lead

PDT

Peko Hosoi

peko@mit.edu

Technical Advisor

EDT

Reed MacPhail

reed.macphail@mlb.com

Sponsor

EDT

 

Meetings:

Monday        (2:30 - 3:00 PM EDT) – Causal Inference Meeting

                      (3:00 - 4:00 PM EDT) – Team Meeting

Tuesday        (1:00 - 2:00 PM EDT) – Mentor Meeting

                       (2:00 - 2:30 PM EDT) – Team Meeting

Wednesday   (2:45 - 3:15 PM EDT) – Sponsor Meeting

Thursday       (1:00 - 2:30 PM EDT) – Team Meeting

 

Deliverables


Team Deliverables

11
WeekTypeAttachment
3Comms #1 

Intro Slides

4Strategy #1 
6Tech #1 
7Strategy #2 

Roadmaps

Weekly Goals (Comms and Tech)

Comms and Labor

Timeframes

9Strategy #2New Strategy
10Progress ReportSlide Deck
11VisualizationMain Visual; All Visuals
12Tech #2 Write Up
13Comms #2

Executive Summary Draft

Engineering Report Draft

 

 

 

Individual Deliverables

WeekDevonEnriqueZackClaireSimran
3DG IT1ZK IT1CW IT1SP IT1
13 (opt.)DG IT2   

 

 

4     5     6     7     8     

Final Deliverable

Final Deliverable

DeliverableFile
Drive Handoff FolderHandoff Folder
Presentation Slides

Final Slides

Final Script

Engineering ReportEngineering Report
Executive Summary

Executive Summary (Results Focused)

Executive Summary (Methodology Focused)


Notes


Meeting Agendas & Notes

Executive Summary
DateAttachment
2/18Touching Base
2/24Team Strategy
2/28Sponsor Call 1
3/2Tech Check In
3/9TT1 Meeting
3/30Post-Apocalypse Check In
3/31PR Mentor Meeting
4/2PR Team Meeting
4/5PR Finalization Meeting
4/14Predictive Meeting
4/15Technical Sponsor Update
  
  
  
  
DeliverableFile
Dropbox Handoff 
Video 
Presentation Slides 
Engineering Report 


 

Navigate space

Page Tree Search

Page Tree