The last meeting of the IACHEC Heritage Working Group was held on the 23th 2nd of April 2015March 2016 (10th 11th IACHEC). The outcome of the discussion is summarized in the following documents:
- Heritage Working Group Charter
- Summary of the 1st Working Group meeting at the 9th IACHEC
- Introduction to and summary of the 2nd Working Group meeting at the 10th IACHEC
- Introduction to and summary of the 3rd Working Group meeting at the 11th IACHEC
- List of actions
- Summary of the 4th Working Group meeting at the 12th IACHEC
- On the in-flight calibration plans of modern X-ray observatories A Synoptic View of In-Flight Calibration Plans (JATIS paper, submitted accepted version, 17 June 29 December 2015)
- Standards for spectral calibration data analysis (IACHEC Report Series#3, draft version 0.1)
IACHEC source database:
- Requirement document
- Current implementation (Credit: AHEAD and Dr. J. RodiQuestionnaire to build an IACHEC knowledge database (draft version 0.1, 7 August 2015)
Library of ground-based and in-flight calibration documents:
- Chandra
- Hitomi (in-flight calibration plan)
- SXS + SXT-S
- Kelley, R. L. et al. "The Astro-H high resolution soft x-ray spectrometer", JATIS, in press
- de Vries, C. et al. "Calibration sources and filters of the soft x-ray spectrometer instrument on the Hitomi spacecraft" , JATIS 4(1), 011204 (2017).
- Leutenegger, M. A. et al. "In-flight verification of the calibration and performance of the ASTRO-H (Hitomi) Soft X-ray Spectrometer", JATIS 4(2), 021407 (2018)
- Eckart, M. E. et al. "Ground calibration of the Astro-H (Hitomi) soft x-ray spectrometer", JATIS 4(2), 021406 (2018).
- Iizuka, R. et al. "Ground-based x-ray calibration of the Astro-H/Hitomi soft x-ray telescopes", JATIS 4(1), 011213 (2018).
- Porter, F. S. et al. "In-flight performance of the soft x-ray spectrometer detector system on Astro-H", JATIS 4(1), 011218 (2018)
- Okajima, T. et al. "First peek of ASTRO-H Soft X-ray Telescope (SXT) in-orbit performance", Proc. of SPIE, 99050Z (2016)
- Kilbourne, C. A. et al. "In-flight calibration of Hitomi Soft X-ray Spectrometer (1) Background" , PASJ, Volume 70, Issue 2, 1 March 2018, 18
- Maeda, Y., et al. "In-flight calibration of the Hitomi Soft X-ray Spectrometer. (2) Point spread function", PASJ, Volume 70, Issue 2, 1 March 2018, 19
- Tsujimoto, M., et al. "In-flight calibration of Hitomi Soft X-ray Spectrometer. (3) Effective area", PASJ, Volume 70, Issue 2, 1 March 2018, 20
- SXI + SXT-I
- Nakajima, H., et al. "In-orbit performance of the soft X-ray imaging system aboard Hitomi (ASTRO-H) ", PASJ, Volume 70, Issue 2, 1 March 2018, 21
- Tanaka, T., et al. "Soft X-ray Imager aboard Hitomi (ASTRO-H)", JATIS 4(1), 011211 (2018).
- HXI
- SGD
- Timing
- Terada Y., et al. "Time Assignment System and Its Performance aboard the Hitomi Satellite", JATIS 4(1), 011206, (2017)
- SXS + SXT-S
- Integral
- JEM-X
Brandt S., et al., “JEM–X inflight performance”, A&A 411, L243–L251 (2003)
Loffredo G., et al., “X–ray facility for the ground calibration of the X–ray monitor JEM-X on board INTEGRAL”, A&A 411, L239–L242 (2003)
Frontera, F., et al. 1997, “Ground and On-Board Calibration Design of the JEM-X Detector” Proc. of the 2nd INTEGRAL Workshop, 16-20 September 1996, St. Malo, France. Edited by C. Winkler, T. J.-L. Courvoisier, and Ph. Durouchoux, European Space Agency, 1997., p.663
Pareschi, G. et al. 1997, “Hard x-ray calibration facility design for JEM-X detector on board INTEGRAL”
SPIE Proceedings Vol. 3114
- SPI
Roques, J. et al. 2003, “SPI/INTEGRAL in-flight performance”, A&A 411, L91–L100 (2003)
Schanne, S. et al 2001, “The space-borne INTEGRAL-SPI gamma ray telescope: test and calibration campaigns”, IEEE, Trans. Nucl. Sci.,p.478 - 482 vol.1
Lonjou, V. et al. 2005, "Characterization of the in-flight degradation of the INTEGRAL/SPI detectors”, Nucl. Inst. Meth. A, 554, 320–330
Schanne et al. 2003, “Calibration of the spectrometer aboard the INTEGRAL satellite”, Proceedings of the SPIE, Volume 4851, pp. 1132-1143 (2003)
Attie, D. et al. 2003, “Integral/SPI ground calibration”, Astronomy and Astrophysics, v. 411(no.1); p. L71-L79
Sturner, S.J. et al. 2003, “Monte Carlo simulations and generation of the SPI response”, A&A 411, L81-L84 (2003)
- IBIS
Caballero, I. et al., “INTEGRAL IBIS/ISGRI energy calibration in OSA 10”, Proc.Conf “An INTEGRAL view of the high-energy sky (the first 10 years)" October 15-19, 2012, Paris, France
R. Terrier et al., “In flight calibration of the ISGRI camera”, Astron.Astrophys. 411 (2003) L167-L172
F. Lebrun, “The ISGRI CdTe gamma camera In-flight behavior”, IEEE Trans.Nucl.Sci. 52 (2005) 3119-3123 astro-ph/0411411
Malaguti, G., Di Cocco, G. & Stephen, J.B, “In-flight calibration requirements for the PICsIT high-energy imaging detector” Proc. SPIE 3765, EUV, X-Ray, and Gamma-Ray Instrumentation for Astronomy X, 42 (October 22, 1999)
Quadrini, E.M. et al.,”IBIS Veto System: Background rejection, instrument dead time and zoning performance”, A&A 411, L153-L157 (2003)
Natalucci, L. et al., “Systematic effects induced on IBIS detectors by background and inhomogeneity of the spatial response”, A&A 411, L209–L213 (2003)
- JEM-X
- NuSTAR
- NuSTAR in-orbit calibration paper: "Calibration of the NuSTAR High-energy Focusing X-ray Telescope", K. K. Madsen et al, ApJS, 220, 8,2015
- HEASARC NuSTAR CALDB documentation
- SPIE telescope articles:
- "2021 Effective Area calibration of the Nuclear Spectroscopic Telescope Telescope Array (NuSTAR)" Madsen, K.K. et al, (2021) JATIS in prep (arXiv paper)
- "In-flight PSF calibration of the NuSTAR hard X-ray optics", H. An et al, 9144, 1, 2014
- "NuSTAR on-ground calibration: I. Imaging quality", N. J. Westergaard, 8443, 2012
- "NuSTAR on-ground calibration: II. Effective area", N. Brejnholt et al, 8443, 2012
- "Coatings for the NuSTAR mission", F. Christensen et al, 8147, 2011
- "NuSTAR ground calibration: The Rainwater Memorial Calibration Facility (RaMCaF)", N. Brejnholt et al2011, 8147, 2011
- "First results from the ground calibration of the NuSTAR flight optics", J. Koglin, 8147, 2011
- "Fabrication of the NuSTAR flight optics", W. Craig et al, 8147, 2011
- "Optimizations of Pt/SiC and W/Si multilayers for the Nuclear Spectroscopic Telescope Array", K. K. Madsen et al, 7437, 16, 2009
- "Evaluation of epoxy for use on NuSTAR optics", H. An et al, 7437, 2009
- "NuSTAR hard X-ray optics design and performance", J. E. Koglin et al, 7437, 2009
- "Manufacture of Mirror Glass Substrates for the NuSTAR Mission", W. Zhang et al, 7437, 2009
- "W/SiC and Pt/SiC multilayers for the NuSTAR hard X-ray telescope", C. P. Jensen et al, 5900, 2005
- SPIE detector articles:
- "Inflight performance and calibration of the NuSTAR CdZnTe pixel detectors", T. Kitaguchi et al, 9144, 2014
- "Spectral calibration and modeling of the NuSTAR CdZnTe pixel detectors", T. Kitaguchi et al, 8145, 2011
- "Development of focal plane detectors for the Nuclear Spectroscopic Telescope Array (NuSTAR) mission", V. Rana et al, 7435, 2009
- SPIE operations articles:
- SPIE mast articles:
- Suzaku (list of suzaku memo)
- XIS
- Koyama et al. "X-Ray Imaging Spectrometer (XIS) on Board Suzaku", PASJ, 2007, 59, S23
Yamada, S. et al. "Data-Oriented Diagnostics of Pileup Effects on the Suzaku XIS", PASJ, 2012, 64, 53
- HXD
- Kouzu, T., et al., "Spectral Variation of the Hard X-ray Emission from the Crab Nebula with the Suzaku Hard X-ray Detector", PASJ 65 74 (2013)
- Yamada, S., et al. "The calibration improvement on GSO scintillators in the Suzaku Hard X-ray Detector" PASJ 63, S645-S656 (2011)
- Fukazawa, Y., et al., "Modeling and Reproducibility of Suzaku HXD PIN/GSO Background", PASJ 61 S17-S34 (2009)
- Terada, Y., et al., "In Orbit Timing Calibration of the Hard X-Ray Detector on Board Suzaku",PASJ 60, S25-S34 (2008)
- Kokubun, M., et al., "In-Orbit Performance of the Hard X-ray Detector on Board Suzaku", PASJ 59, S53–S76 (2007)
- Fukazawa, Y., et al., "Inflight calibration and performance of the Hard X-ray Detector (HXD) onboard Suzaku", Proceedings of SPIE, Vol. 6266, pp.75-86 (2006)
- Terada, Y., et al., "Development of a Monte Carlo Simulator for the Astro-E2 Hard X-ray Detector (HXD-II)", IEEE TNS Vol. 52, Issue 4, pp. 902-909 (2005)
- HXD-WAM
- Yamaoka, K., et al., "Design and In-Orbit Performance of the Suzaku Wide-Band All-Sky Monitor", PASJ 61, ppS35-S53 (2009)
- Yamaoka, K., et al., "In-orbit performance of the Suzaku wide-band all-sky monitor", Proceedings of SPIE, Vol. 6266, pp. 626643-1-626643-12 (2006)
- Ohno, M., et al., "Preflight Calibration and Performance of the Astro-E2/HXD-II Wide-Band All-Sky Monitor", IEEE TNS Vol. 52, Issue 6, Part 2, pp. 2758-2764 (2005)
- XIS
- Swift (in-flight calibration plan)
- XARM
- Resolve (formally SXS)
- Xtend (formally SXI)
- XMM-Newton: