1. All nuts should be epoxied in on back side, or otherwise somehow fastened on better (maybe locking nuts). Almost all the bolts were loose after the three drops.
...
4. Make parts for at least 2 more AV towers, maybe 3. Consider adding more bolts to attach to payload bulkhead.
5. Figure out a way to fasten fireflies from the top, and keep SD cards in.
Avionics Next Steps:
1. Learn to better get data from COTS altimeters, i.e. better control of turning them off and on.
...
- Slammed the entire structure down
- Whole AV tower broke
- Measured 50 gs on Marsa, 70 m/s^2 on Telemega (Hermes I saw 140 m/s^2 max acceleration)
- These numbers seem fishy/not a great test
Notes overall:
All nuts were loose afterwards
SD card came out
Fjrefly Firefly camera turned on
Used the 6061 non-optimized payload bulkhead
Used ground test MP tube (NOT flight)
Received telemetry the whole time
Had continuity before and after test
...