Result or Product of this Process

Round Rectangle
bgcolor#e6f2ff
width100%

The Bidding process allows the Project Manager to manage the bid for the entire bid process including:

  • Bid List approval
  • Release to bid
  • Bid award recommendation.

Process Details

...

04.01 Bidding process is used for Bid List Approval, Release to Bid and Bid Award Recommendation including these specific steps.

  • Obtain an approved list of bidders
  • Prepare and gain approval of the bid package documents including the proposed sample contract provided by the Contract Admin
  • Secure approval to release the bid
  • Recommend an award supported by the bid tabulation in the Bidding module.
  • Gain approval to use a pre-priced agreement to award certain types of work to selected vendors.
  • Create the Selection of Source form and have it reviewed and approved by the Vendor Manager
  • Following approval, award the bid.
  • Ensure that the awarded bidder is properly set up in e-Builder and SAP

Note that the Bidding process is used to inform internal actors about the bid and gain approval to proceed through the bidding stages, from Bid List approval to award. The Bid module is used to construct and publish the bid to the Bidders portal and to initiate your Contract and Purchase order request.

Process Details

...

Deck of Cards
idBid
Card
labelSummary

This process includes Bid List Approval, Release to Bid and Bid Award RecommendationThe Bidding process and the Bidding module are both used to complete a bid and issue an award.

Card
labelProcess Map

 Image Added

Card
labelStep Descriptions

To make the Step descriptions for Bidding easier to read they have been separated into the three discrete parts below. While Bidding is one process, the supporting documentation is made easier to read by making this division.

This is a draft. Once the process is finalized I will add step numbers.

(tabs). 

Deck of Cards
idSDBid
historyfalse

Card
labelBid List Approval

Toggle Cloak
Start

Cloak
  • The Bidding process is started usually initiated by the Project Manager, OCP Planner, SPT Lead, SPT Commissioning Lead or VPF Strategic Sourcing. Regardless of who initiates the process the final step is Submit.
  • Depending on the project the initiator completes the required sections of the page.
    • Contract Management
    • Pre-Priced Agreement for Office/CR/Lab
    • Sole Source
    • Potential Bidders - When adding potential bidders you should add contact information for each bidder prior to submitting for Vendor Manager review. If that information is not provided the process will be returned to your court for the Initiator Revise step
  • When finished, take the Submit action.
  • The next step is A133 Been Signed Furniture or AV Bid?

Toggle Cloak
Furniture or AV Bid? (Decisional Step)

Cloak
  • The data field Based on the process initiator's answer to the "Is this a furniture or AV bid?" question the process is evaluatedrouted.
  • If True (Yes) the next step is PM Prepares Bid Documents.Doc Preparation
  • If False (No) the next step is Vendor Manager Review. AV?

Toggle Cloak
A133 Been Signed? (Decisional Step)AV?

Cloak
  • The data field "Has the A133 Been Signed?" is evaluatedBased on the process initiator's answer to the "Is this a furniture or AV bid?" question the process is routed.
  • If True (Yes) the next step is PM Prepares Bid Documents. Vendor Mgr Reviews A/V Bid
  • If False (No) the next step is Sole Source?

Toggle Cloak
Vendor Mgr Reviews A/V Bid

Cloak
  • In this step the Vendor Manager reviews the Bid information. The process reaches this step for A/V Bids.
  • If the Submit action is taken the next step is Program Manager Reviews.
  • If the Revise action is taken he next step is Initiator Review.

Toggle Cloak
Vendor Manager ReviewMgr Reviews Prop Bid List

Cloak
  • The Vendor Manager completes the required fields and has the option to Submit or Revise.
  • If Submit is chosen the next step is Program Manager Reviews.
  • reviews the proposed bid list.
  • If approved the Vendor Manager takes the Submit action. The next step is Prepriced Agmt?
  • If the Revise action is taken he next step is Initiator Review.

Toggle Cloak
Prepriced Agmt?

Cloak
  • The system evaluates this conditional to determine if this is a Pre-priced agreement. Using a pre-priced agreement bypasses the process steps which generate an Approved Bid List.
  • If the use of a pre-priced agreement is approved, the work is awarded to a vendor who has previously bid for for work of a certain scope/complexity in order to be considered for that work in the future.
  • If Pre-priced Agreement is True (Yes) the next step is CA Approved Contract Type.
  • If it is False (No) the next step is Program Manager Review.

Toggle Cloak
Sole Source?

Cloak
  • The system evaluates this conditional to determine if this is a Sole Sourced agreement. Using a Sole Sourced agreement bypasses the process steps which generate an Approved Bid List.
  • If the use of a Sole Source agreement is approved, an explanation must be provided.
  • If this conditional evaluates to True (Yes) the next step is Vendor Reccomendation.
  • If this conditional evaluates to False (No) the next step is Vendor Mgr Reviews Prop Bid ListIf Revise is chosen the next step is Initiator Revise.

Toggle Cloak
Initiator Revise

Cloak
  • Initiator Revise is used to request that the initiator correct an error or add more information to a prior step.
  • The Initiator The initiator reviews the process adds comments and the comments made by the reviewer and makes adjustments as necessaryrequired. The Action options for the indicator initiator are To Vendor Manager, To Program Manager or Void.
  • If To Vendor Manager is chosen the next step is Vendor Manager ReviewMgr Reviews Prop Bid List.
  • If To Program Manager is chosen the next step is Program Manager Review.
  • If Void is chosen the next step is Finish.
 

Toggle Cloak
Program Manager ReviewReviews

Cloak
  • The Program Manager reads the comments and reviews the process fields. The Program Manager has options fields and has the option to take an Action to Submit or Revise.
  • If Submit is chosen the next step is Sole SourceCampus Construction?
  • If Revise is chosen the next step is Initiator Revise.
The data field "Sole Source?" is evaluated.

Toggle Cloak
Sole Source? (Decisional Step)

Cloak

  • If True (Yes) the next step is VPF Procurement Reviews Bid Package
  • If False (No) the next step is

    Campus Construction?

    .

    Toggle Cloak
    Campus Construction? (Decisional Step)

    Cloak
    • e-Builder uses information previously entered about the project
    Cloak
    • Multiple fields are evaluated to determine if this is a Campus Construction project.
    • If Yes the next step is SP&T Program?
    • If No the next step is OCP?
     

    Toggle Cloak
    SP&T Program? (Decisional Step)

    Cloak
    • Multiple fields are evaluated to e-Builder uses information previously entered about the project to determine if this is an SP&T Program.
    • If True (Yes) the next step is VPF Strategic Sourcing SPT Director Review.
    • If False (No) the next step is Projects CC Director Review.

    Toggle Cloak
    SPT Director Review

    Cloak
    Cloak
    • The SPT Director reads the comments and reviews the process fields and has the option to Submit or Revise.
    • If Submit is chosen the next step is CC Director Review.
    • If Revise is chosen the next step is Initiator Revise.

    Toggle Cloak
    Projects Director Review

    • The Projects Director reads the comments and reviews the process fields and has the option take an action to Submit or Revise.
    • If Submit is chosen the next step is CC Director Review.
    • If Revise is chosen the next step is Initiator Revise.

    Toggle Cloak
    CC Director Review

    Cloak
    • The CC Director reads the comments and reviews the process fields and has the option to take an action to Submit or Revise.
    • If Submit is chosen the next step is Approved Bid List (The bid list is approved and Mail Merge creates the bid list)
    • If Revise is chosen the next step is Initiator Revise.

    Toggle Cloak
    OCP? (Decisional Step)

    Cloak
    • Multiple fields are evaluated to e-Builder evaluates information previously entered about the project to determine if this is an OCP Program.
    • If True (Yes) the next step is OCP Director Review.
    • If False (No) the next step is M&U?

    Toggle Cloak
    OCP Director Review

    Cloak
    • The OCP Director reads the comments and reviews the process fields. The OCP Director has
    options
    • the option to take an Action to Submit or Revise.
    • If Submit is chosen the next step is Approved Bid List
    (The bid list is approved and Mail Merge creates the bid list)
    • If Revise is chosen the next step is Initiator Revise.

    Toggle Cloak
    M&U? (Decisional Step)

    Cloak
    • Multiple fields are evaluated to e-Builder evaluates information previously entered about the project to determine if this is an M&U program?
    • If Yes the next step is Utilities Program?
    • If No the next step is Campus Services?

    Toggle Cloak
    Utilities Program? (Decisional Step)

    Cloak
    • Multiple fields are evaluated to e-Builder evaluates information previously entered about the project to determine if this is a Utilities Program.
    • If True (Yes) the next step is Utilities Director Review.
    • If False (No) the next step is SEG Program?

    Toggle Cloak
    Utilities Director Review

    Cloak
    • The Utilities Director reads the comments and reviews the process fields. The Utilities Director has the option to take an Action to Submit or Revise.
    • If Submit is chosen the next step is M&U Director Review.
    • If Revise is chosen the next step is Initiator Revise.

    Toggle Cloak
    SEG Program? (Decisional Step)

    Cloak
    • Multiple fields are evaluated to e-Builder evaluates information previously entered about the project  to determine if this is an SEG Program.
    • If True (Yes) the next step is SEG Director Review.
    • If False (No) the next step is O&M Director Review?

    Toggle Cloak
    SEG Director Review

    Cloak
    • The SEG Director reads the comments and reviews the process fields. The SEG Director has the option to Submit or Revise.
    • If Submit is chosen the next step is M&U Director Review.
    • If Revise is chosen the next step is Initiator Revise.

    Toggle Cloak
    O&M Director Review

    Cloak
    • The O&M Director reads the comments and reviews the process fields. The O&M Director has the option to Submit or Revise.
    • If Submit is chosen the next step is M&U Director Review.
    • If Revise is chosen the next step is Initiator Revise.

    Toggle Cloak
    M&U Director Review

    Cloak
    • The M&U Director reads the comments and reviews the process fields. The M&U Director has the option to Submit or Revise.
    • If Submit is chosen the next step is Approved Bid List
    • If Revise is chosen the next step is Initiator Revise.

    Toggle Cloak
    Campus Services? (Decisional Step)

    Cloak
    • Multiple fields are evaluated e-Builder evaluates information previously entered about the project to determine if this is an Campus Services Program.
    • If True (Yes) the next step is CS Director Review.
    • If False (No) the next step is IBO Director Review?

    Toggle Cloak
    CS Director CS Director Review

     
    Cloak
    • The CS Director reads the comments and reviews the process fields. The CS Director has the option to Submit or Revise.
    • If Submit is chosen the next step is Approved Bid List (Mail Merge). (The bid list is approved and Mail Merge creates the bid list.)
    • If Revise is chosen the next step is Initiator Revise.

    Toggle Cloak
    IBO Director Review

    Cloak
    • The IBO Director reads the comments and reviews the process fields. The IBO Director has the option to Submit or Revise.
    • If Submit is chosen the next step is Approved Bid List (Mail Merge). (The bid list is approved and Mail Merge creates the bid list.)
    • If Revise is chosen the next step is Initiator Revise.

    Toggle Cloak
    Initiator Revise

    Cloak
    • The initiator revises the process and adds comments if necessary. The initiator Submits when finished with revisions.
    • The If the Submit action is taken the next step is Sole Source?
    • If Void is chosen the next step is Finish.

    Toggle Cloak
    VPF Procurement Reviews Bid PackageApproved Bid List

    Cloak
    • This step generates the Approved Bid List document from a template
    • The bid list document is placed into the Documents\05 Procurement\0505 Bid Lists (I) folder
    • The next step is CA Apprv Contract Type.
    Card
    labelDocuments, Contract Approval, Release Bid

    Toggle Cloak
    CA Apprv Contract Type

    Cloak
    • The Contract Admin either approves or changes the contract type or approves the Pre-priced agreement and adds the contract number for that agreement to the process.
    • The Contract Admin takes the Approved action to approve. The next step is Approved Pre-Price.
    • The Contract Admin takes the Changed action when changing the contract type, and adds comments to indicate to the PM that the contract has been changed and the reasons for the change.
    • The next step is Bid Doc Preparation.

    Toggle Cloak
    Approved Pre-Price Agreement

    Cloak
    • This is a conditional step. If True (a Pre-priced agreement) the next step is the Merge/Code step that creates the Selection of Source form document.
    • If False the next step is Bid Document Preparation.

    Toggle Cloak
    PrePriced SoS

    Cloak
    • e-Builder generates the Selection of Source for Pre-priced agreements.
    • The next step is Vendor Manager Review of SoS.

    Toggle Cloak
    Bid Document Preparation

    Cloak
    • The process initiator, usually the Project Manager, prepares/uploads the bid documents and completes the required fields. The Submit action is taken when finished.
    • The next step is Contract Admin Assembles Bid Package

    Toggle Cloak
    Contract Admin Assembles Bid Package

    Cloak
    • The Contract Admin assembles the bid package and when finished takes the Submit action.
    • As part of this process the Contract Admin adds a contract sample and assigns a contract number.

    • The next step is Hold for Bids/Proposals Received.

    Toggle Cloak
    Hold for Bids/Proposals Received

    Cloak

    The bid should be released in the Bid module when the process reaches this step.

    • Hold the process in this step from bid release until all bids are received and the bid tab has been opened and analyzed. This may be held for one to several weeks while the bid is open.
    • Once the bids have been analyzed and a vendor recommendation is ready the Project Manager takes the Submit action.
    • The next step is Vendor Recommendation.
    Card
    labelBid Award Recommendation

    Toggle Cloak
    Vendor Recommendation

    Cloak
    • The Project Manager, having received all the bids and supporting documents, performs the analysis and selects a vendor.
    • The process step form is completed and the Submit action is taken.
    • The next step is Selection of Source.

    Toggle Cloak
    Selection of Source

    Cloak
    • This is an automatic step to generate the Selection of Source document. The Selection of Source template is applied.
    • The next step is Vendor Manager Review of SoS.

    Toggle Cloak
    Vendor Manager Review of SoS

    Cloak
    • The Vendor Manager reviews the selection and has the option to take the Action to Submit or Revise
    • If Submit is chosen the next step is Program Manager Review
    • If Revise is chosen the next step is Vendor Recommendation.

    Toggle Cloak
    Program Manager Review

    Cloak
    • The Program Manager
    Cloak
    • The VPF/Treasury reads the comments and reviews the process fields. The following are the possible actionsprogram manager has the option to take an Action to Submit or Revise.
    • If Submit is chosen the next step is Campus Construction.
    • If Revise is chosen the next step is Initiator Revise Recommendation.

    Toggle Cloak
    Approved Bid List (Automatic Step)

    Cloak
    • Automatic step generates the Approved Bid List document.
    • The next step is Initiator Prepares Bid Documents.
    Card
    labelRelease to Bid

    Initiator Revise Recommendation

    Cloak
    • The Initiator reviews the process and adds comments and makes adjustments as necessary. The initiator has the option to Submit or Void.
    • If Submit is chosen the next step is Selection of Source.
    • If Void is chosen the next step is Finish.

    Toggle Cloak
    Campus Construction?

    Cloak
    • e-Builder uses information previously entered to to determine "ownership" of the program.
    • If True (Yes) the next step is SP&T Program.
    • If False (No) the next step is M&U.

    Toggle Cloak
    SP&T Program?

    Cloak
    • The "Contract managed by a different program" field is evaluated.
    • If True (Yes) the next step is SPT Director Review.
    • If False (No) the next step is Vendor Manager Review of SoS

    Toggle Cloak
    SPT Director Review

    Cloak
    • The SPT Director reads the comments and reviews the process fields. The SPT Director has the option to Submit or Revise.
    • If Submit is chosen the next step is Vendor Manager Review of SoS.
    • If Revise is chosen the next step is Initiator Revise.

    Toggle Cloak
    M&U2?

    Cloak
    • e-Builder uses information previously entered to determine "ownership" of the program.
    • If True (Yes) the next step is Utilities Program?
    • If False (No) the next step is Campus Services?

    Toggle Cloak
    Utilities Program?

    Cloak
    • e-Builder uses information previously entered to determine "ownership" of the program.
    • If True (Yes) the next step is Utilities Director Review.
    • If False (No) the next step is SEG Program?.

    Toggle Cloak
    Utilities Director Review Rec

    Cloak
    • The utilities director reads the comments and reviews the process fields. The utilities director has the option to Submit or Revise.
      If Submit is chosen the next step is M&U Director Review Rec.
    • If Revise is chosen the next step is Initiator Revise Recommendation.

    Toggle Cloak
    SEG Program?

    Cloak
    • e-Builder uses information previously entered to determine if this is an SEG Program.
    • If True (Yes) the nest step is SEG Director Review Rec
    • If False (No) the next step is O&M Director Review Rec

    Toggle Cloak
    SEG Director Review Rec

    Cloak
    • The SEG Director reads the comments and reviews the process fields. The SEG Director has the option to take an Action to Submit or Revise.
    • If Submit is chosen the next step is Vendor Manager Review of SoS.
    • If Revise is chosen the next step is Initiator Revise Recommendation.

    Toggle Cloak
    O&M Director Review Rec

    Cloak
    • The O&M Director reads the comments and reviews the process fields. DoF Procurement has the option to Submit or Revise.
    • If Submit is chosen the next step is Vendor Manager Review of SoS.
    • If Revise is chosen the next step is Initiator Revise Recommendation.

    Toggle Cloak
    CC Director Review

    Cloak
    • The CC Director reads the comments and reviews the process fields. CC Director has the option to Submit or Revise.
    • If Submit is chosen the next step is Initiator Awards Bid.
    • If Revise is chosen the next step is Initiator Revise Recommendation.

    Toggle Cloak
    OCP?

    Cloak
    • Multiple fields are evaluated to determine if this is an OCP Program

    Toggle Cloak
    Initiator Prepares Bid Documents

    Cloak
    • The initiator prepares the bid documents, completes the required fields and Submits when finished.
    • The next step is DOF Procurement Assembles Bid Package.

    Toggle Cloak
    Has A133 Been Signed? (Decisional Step)

    Cloak
    • The data field "Has the A133 been signed?" is evaluated.
    • If True (Yes) the next step is Program Manager Reviews Package OCP Director Review.
    • If False (No) the next step is M&U?.

    Toggle Cloak
    OCP Director Review

    Cloak
    • The OCP Director reads the comments and reviews the process fields. OCP Director has the option to Submit or Revise.
    • If Submit is chosen the next step is DoF Procurement Assembles Bid Package Initiator Awards Bid.
    • If Revise is chosen the next step is Initiator Revise Recommendation.

    Toggle Cloak
    DoF Procurement Assembles Bid PackageM&U Director Review Rec

    Cloak
    • The DOF Procurement M&U Director reads the comments and reviews the process fields DoF Procurement may and has the option to Submit or Revise
    • If Submit is chosen the next step is Projects Director Reviews Package Initiator Awards Bid
    • If Revise is chosen the next step is PM Prepares Bid Documentsis Initiator Revise Recommendation.

    Toggle Cloak
    Campus Services?

    Cloak
    • Multiple fields are evaluated to determine if this is an Campus Services program?
    • If True (Yes) the next step is CS Director Review.
    • If False (No) the next step is IBO Director Review.

    Toggle Cloak
    Program Manager Reviews PackageCS Director Review

    Cloak
    • The program manager Campus Services Director reads the comments and reviews the process fields. The program manager CC Director has the option to Submit or Revise.
    • If Submit is chosen the next step is DoF Procurement Assembles Initiator Awards Bid Package.
    • If Revise is chosen the next step is PM Prepares Bid Documents Initiator Revise.

    Toggle Cloak
    Projects IBO Director Reviews PackageReview

    Cloak
    • The Projects IBO Director reads the comments and reviews the process fields. The Projects Director may Submit of IBO Director has the option to Submit or Revise.
    • If Submit is chosen the next step is Release to Bid (Mail Merge) Initiator Awards Bid.
    • If Revise is chosen the next step is PM Prepares Bid Documents Initiator Revise.

    Toggle Cloak
    Initiator Releases Award Bid

    Cloak
    • The initiator completes Initiator reviews the required process fields, Submits and uses and awards the bid using the e-Builder Bidding module to send the bids to the approved bid list. The final action when the bid is awarded is to return to the process and take the Submit Action.
    • The next step is Vendor Manager Checks Company Info.

    Toggle Cloak
    Pre-Priced 3?

    Cloak
    • This conditional determines if this process contains a Pre-priced agreement.
    • If True the process moves to Finish.
    • If False the process moves to Vendor Manager Checks Company Info

    Toggle Cloak
    Vendor Mgr Checks Company Info

    Cloak
    • The Vendor Managerchecks and fills out form fields to ensure that:
      • The awarded bidder exists in SAP
      • The company information is correct and current in the Contacts module.
      • If the company is not in SAP that the New Company process has been started.
    • When finished the Vendor Manager takes the Submit action.
    • The next step is Vendor Exists in SAP?

    Toggle Cloak
    Vendor Exists in SAP?

    Cloak
    • This step routes the process to the Finish step if the Vendor exists in SAP.
    • If the Vendor does not exist in SAP the next step is AA Adds New Company.

    Toggle Cloak
    AA Adds New Company

    Cloak
    • If the company does not exist in SAP the AA completes the 01.01 Add New Company/Contact process and holds the process in this step until that has been completed.
    • When completed the AA takes the Vendor Added action.
    • The next step is Initiator Recommends Vendor .
    Card
    labelBid Award Recommendation

     

     

    • Manager Checks Company Info.

    Toggle Cloak
    Hold for SAP Vendor #

    Cloak
    • In this step the Administrative Assistant waits until the Vendor has been assigned a SAP Vendor Number from VPF.
    • If the Submit action is taken the next step is Finish.
    • If the Revise action is taken the next step is AA Adds New Company.

    Toggle Cloak
    Finish

    Cloak