...
- Pack tools & GSE listed in assembly checklists
- Pre-charge cameras, payload, and ALL altimeter batteries
- Stow in containers that will go to LA
- Pack coolers of food, tents, tables
- Transport only packed tools to the hangar
- Assemble Hermes II in the hangar
- forgotten tools, missing parts require time delays to be recorded
- Put in "Final Integration" state
- Go to sleep, wake up early the next morning
- Depart hangar at 7am
- Collect everyone at the hangar prior to going to Field A
- If people sleep in, they are "sick" and cannot take on the usual role
- Set up tables & test stand as "launch tower" on Briggs prior to transport (simulate "FAR")
- Pack a car with rocket & GSE, drive to Kresge oval
- Transport to Briggs Field with GSE
- Perform Integration & Prelaunch procedures (except igniter, incl. raising to vertical)
- Verify telemetry in launch ready configuration
- Perform "rocket take down" procedures
- Change out a battery batteries in the AV Bay, LE, and NC
- Bring rocket back to launch-ready configuration, verify telemetry
- Perform "rocket take down" procedures
- Perform "Launch" with telemetry and video during a ground test
- Recommended: Recovery team walks 2 miles with backpacks & of water & snacks
- Rest of team does launch site cleanup
- Use recovery procedures to pick up & safe the rocket
- Recommended: Recovery team walks 2 miles with the rocket and backpacks & of water & snacks
- Transport back to lab
- Log all data
- Report estimated total time (with delays)
...