Result or Product of this Process

Round Rectangle
bgcolor#e6f2ff

Project managers use this process to update the status of their project. This The process displays the most recent update information on the same page used to update project information . (MIT created. Update 4/2018 SA/RB)

Note

This process replaces the 10.01 Project Manager's Update.

Composition Setup
 

and allows the use of a "sleep timer" to set an interval for the next PMU update to appear in your court.

See the Step Instructions tab for detailed instructions, including how to use this process to only update the Project Status that is located on the Details page.

Deck of Cards
idPMU
Card
labelSummary
  • Project managers should use this process to provide project updates at regular intervals including . Updates should include confirming or updating the current project status, the estimate at Completion, a current photo and schedule notesand pertinent details about the project.
  • The project manager will be asked to enter their name as part of the update. This simulates is considered signing the update.
  • The PM submitted date will be filled in when the Submit step is taken.
  • This process has been updated in two significant ways.
  1. The process will start (spawn) a new process for your next update whenever the project status is something other than "Complete". Use the automatically started process located "In your Court" for subsequent updates.
  2. By using the automatically started process your most recent update will display on the left side of the page while you complete the current update on the right side. (See the Start Step instructions)
Note

When creating the first project manager update for a project the Submit action will move the process to the PM Update Status. Only for For only the first update, it will be is necessary to submit take the update a Submit action second time from the PM Update Status step.

Gliffy Diagram
bordertrue
chromemin
size300
nameFirst Time Flow

Card
labelProcess Map

Image RemovedImage Added

Card
labelQuick StartStep Instructions
Note

Please note:  Is this a One-Off or the Last Update is a great option for DAILY UPDATES.

Answer Yes if you wish only to update the Project Status on the Details page or if this is the last detailed update for which you wish to use the sleep timer functionality.

When the Yes option is used, in both instances above, no new spawned processes will occur. If you have used the Yes option, and at a later date, you want another PMU and the option to use the sleep timer simply start a new instance of the process.

Section
Section
Column
width10%

Start Step

Image Removed

Column
width45%

Image RemovedImage Added

Column
width45%

Instructions

 
  1. Using the drop-down menu, choose the Current Project Status.
 Instructions
  1. Enter the Current Project Update (by PM). Note that the text box for this is expandable
    by dragging the bottom right corner of the text box. This is a required field.
  2. Usng the dropdown menu, choose the Current Project Status.
  3. Enter the Current PM Estimate at Completion.
  4. Add a photo (if desired) to be included in the
  5. Project Manager's Project Update
  6. Current Photo field.
  7. Please enter your name in the Project Manager field. This action simulates affixing your signature to the information
  8. .Indicate
  9. .
  10. The PM Submitted Date will be the date on which you take the Submit action.
  11. "Is this the Last Update?" Choosing "Yes" will end all the current PMUa process session. If you need to create a new update you can always start a new PMUa process for the project. Note: if you do restart you will need to run the task through 2x just as you did the first time for full feature set to work.
  12. In the Project Schedule Updated? Field indicate if the project schedule has been updated. (Yes, No, N/A)
  13. Enter Schedule Notes. This text box is also expandable.
  14. The PM submitted date will be the date on which you take the Submit action.
  15. Click the Submit button
  16. Click the Submit button.*

*Submit from the PM Update Status step if this is the first PMU for the project.

If the PMU is not ready to Submit use the Save Draft button to save your work and return to complete and submit the PMU at a later date.

Section

Toggle Cloak
Start

Cloak
  • The Initiator has an opportunity to enter information into the Current Project Status, Current Project Update (by PM),  

 

 

  • Project/Drawing Stage, EHS Update, FE Update, FIS/Signage Update, IS&T/Security Update, SPT Update, Current SF, Current PM Estimate at Completion, Room(s) Affected, Current Photo, Project Manager, PM Submitted Date, Is this a One-Off or the Last Update?. These fields will be updated to the projects details page.
  • When the Submit action is taken the next step is Report Generation.

Toggle Cloak
Timer set <=1?

Cloak
  • This is an e-Builder conditional.
  • No user interaction is required.
  • This step evaluates if the initiator set the Remind me in days to 1 or less and send it back to them if True
  • The process continues if the value is >1 (note the value must be a whole number as the instructions explain to the user)

Toggle Cloak
Set Timer to a whole # > 1 e.g. 5,10

Cloak
  • This is an e-Builder user step
  • The initiator ends up on this step if they do not follow the directions provided and provide a whole # > 1
  • The initiator is given additional, clear instructions to change the value to a whole # > 1
  • The user submits this process and it goes back the the prior conditional to ensure the user complied with the instructions

Toggle Cloak
Report Generation

Cloak
Section
Column
width10%

Report Generation Step

Image Removed

45%width
Column
width
  • This is an e-Builder system step.
  • No user interaction is required.
Column

Explanation

45%
  • This step evaluates if this is the first time a PMU has been generated for this project and routes the process accordingly.

 

 

Section
Column
width10%
Toggle Cloak

PM Status Report

Step

Image Removed

column
Cloak
Column
width45%
  • This is a mail merge step.
  • No user interaction is required.

Explanation

width45%
  • This step produces a hard copy of the PMU from a template.

 

 

Toggle Cloak
PM Update Status

Cloak
Section
Column
width10%

 PM Update Status Step

 

Image Removed

Column
width45%

Explanation

See
  • This is an update step completed by the project manager.
Column
width45%
  •  See the instructions for the Start Step. Project managers complete the same fields in this step.

 

 

Toggle Cloak
Subs or Punchlist?

Cloak
  • This is a conditional that is looking for a status setting of Substantially Complete or Punchlist
  • If either is true then a mail merge is generated (Punchlist Notification)
  • the process then moves to the conditional "Project Active" step

Toggle Cloak
PM Closeout status?

Cloak
  • This is a conditional that is looking for a status setting of PM Closeout
  • the process then moves to the conditional "CRSP Project" step

Toggle Cloak
CRSP Project?

Cloak
  • This is a conditional that is looking for a project type setting of CRSP
  • If true then a mail merge is generated (CRSP AA Notification)
  • If false then a mail merge is generated (AA/PM 14.2 Status)
  • In either scenario , the process then moves to the conditional " Project Active" step

Toggle Cloak
Accounting Closeout Status?

Cloak
  • This is a conditional that is looking for a status setting Accounting Closeout
  • If true then a mail merge is generated (Accounting Close)
  • If false then a mail merge is generated (Document Closeout)
  • In either scenario , the process then moves to the conditional " Project Active" step

Toggle Cloak
Project Active

Cloak
  • This
Section
Column
width10%

 Project Active Step

Image Removed

 

45%
Column
width45%
width This
  • step determines if the project status is Active.
  • If it is no longer active no new update process will be started.
  • No user interaction is required.
Column

Explanation

  • No instructions are needed for this step.

 

 

Toggle Cloak
Last PM Update?

Cloak
  • This conditional checks if the Is this the Last Update? field is answered as Yes.
  • If True the next step is Finish
  • If False the next step is PMU Release Timer

Toggle Cloak
Spawn New Update

Cloak
Section
Column
width10%

 Spawn New Update Step

Image Removed

Column
width45%
  • This step starts a new PMU process to be used for the next PMU.
  • No user interaction is required.
Column
width45%
Explanation
  • The new process will be placed in the project manager's court and may remain there until needed. It will contain information from the previous update for reference.
 

Toggle Cloak

 

Section
Column
width10%

 Finish Step

Image Removed

Column
width45%

There is no user interaction with this step.

Column
width45%

 

 

 

Finish

Cloak
Card
labelTraining
 Please contact the e-Builder team for training by sending email to dof-ebuilder-info@mit.edu.