...
Cloak | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
- Troubleshooted PCR - considered lowering annealing temp, only doing one pcr at a time Transferred BACE1 to liquid culture
PCR on BACE2 and eYFP performed for both constructs (N and C term) of BACE2 and eYFP
Annealing temperature was determined from the NEB calculator to be 58C and 59C for the two constructs. The lower temperature was chosen to do all at the same time. Since this mix includes 3% DMSO, the annealing temp was lowered by 0.6C per 1% DMSO to 56.2C
Gel Hyperladder 1kb | C eYFP | C BACE2 | N eYFP | N BACE2 @120V
|
AL - 6/25
Toggle Cloak |
---|
Cloak |
---|
Performed miniprep as per protocol on BACE1 liquid culture
|