  1. W AL paper, Bernd, ver 3.0
    most of comments from STAR collaboration were addressed, ready to sent to GPC again
  2. W x-section paper
    1. absolute lumi, Ross
      attempted new approach to estimate systematic error due to non-gaussianity, not converging yet, not sure if it ever will. Another idea of using deviation of chi2/dof from 1 as measure of syst error is investigated. The final table of integrated lumi per run (ver 4f) is attached to the drupal page.
    2. M-C simu: Justin, Jan
      EEss in dev, Lidia will tag it soon. Jan: pilot 1K even per sample will follow, with fixed single time stamp. Justin is working evaluation if EEss works properly.
    3. preliminary paper outline / motivation issues: Scott
      need to make decision soon if pol analysis are described in this paper.
    4. preliminary SN outline: Justin
    5. Willie resumed work on absolute BSMD calib based on run 9, we talk a lot, got air pressure values from Oleksandr, plot
    6. more ...
  3. Preparation for run 11:
    1. TPC working point for pp500 in run 11 Gene
  4. AOB

...