- pedestals & status tables
- input : L2ped output, new set every day, no BFC
- processing Justin(IUCF) produces tables, Matt (MIT) uploads to DB
- latency : 1 day, starts March20
- BTOW Relative Calibration
- method:
- for every tower for every eta ring, Jan will produce muDst for 15 regular production runs: http://online.star.bnl.gov/RunLog/Summary.php?run=10088102 production2009_500Gev_c
- input :1.4M minB events from dedicated run, needs BFC production
- processing : fit slopes using BTOW Calibration Scott's method with integral driven limits of slope range, 2 days of work, WHO ? Scott?latency : 15 tar balls w/ muDst will be saved in HPSS, to be process in one pass on demand.
- status : ( 7 May 2009 )
- Jan
- created a .hist.root file *
- Justin
- extracted slopes, a
- large .pdf file shows
- slope. There is also a much smaller .txt file which contains softID, slope, and slope error for each tower.
- BTOW Relative Calibrationstatus 28 August 2009 : in limbo
- absolute gains: assume maxET=60 GeV @ ADC=4076
- assume eta-dependence =sin(theta) , NO confirmation of absolute scale from 2009 data
- status 28 August 2009 : Matt looks at electrons from SL09b production