Part | Component Status | Responsible Engineers | |
---|---|---|---|
Booster Cup | Manufacturing Prep | Manufactured | Nicole CDiego D. 2024, Christina N. 2024 |
Sustainer Cup | Manufacturing Prep | Diego D. 2024, Christina N. 2024 |
Design
Requirements:
- Shall contain soft goods prior to separation
- Shall withstand separation loads
- Shall separate from the nose cone/staging cone
...
- Cut coupler tube to length on the horizontal bandsaw
- Sand faces to level
- Cut a piece of supporting material to go inside the cup while machining it
- Add holes with radial indexer (Note: *Note: add holes 0.3 inches from the side that has the better machine-finish)
- 12 holes equate to 3 1/3 turns for each hole on the 18-radius marker on the radial indexer in N-51
- Safety note: use air gun to blow away fiberglass dust as soon as each hole has been completed.
- Sand interior and exterior until slides smoothly into mission package tube