  • The Pyxida could see more satellites on the launch pad than the TeleMega could.

  • Configuration lists for the COTS altimeters helped ensure we had the right settings for the TeleMega and Marsa.
  • We had Pyxida radio connection at both the away team and the launch line.
  • At least one camera was turned on and taking video from Pyxida.
  • We got telemetry data from TeleMega at both the away site and launch line.
    • The away team received signifcant amounts of packets across the duration of the entire flight.
  • Antennas - We color coded these with tape to ensure they were correctly attached to their corresponding SMA connector that went to the TeleMega and Pyxida.
  • TeleMega remained on even after the rocket broke apart.
  • A lot of new avionics members were trained and hopefully learned a lot throughout the year.
  • New Pyxida hardware was designed and manufactured, and fixes were found and made on all the boards over IAP.
  • We made a lot of progress with Pyxida radio and did range testing from the green building twice.
  • A lot of progress on the ground station was made, a new mock Pyxida was designed to test it, and we succesfully moved from PySide to PyQt
  • Over 100 unit tests and a hardware testing script were created for the Pyxida Firrmware
  • PCBs and were made to control cameras and sofware was written for them.

...