Variable | Length (in inches) | Description |
---|---|---|
hmp | 51.3 | Total height of mission package |
lmp | 17.8 | Distance from diaphragm to end of mission package |
lfc | 4.75 | Depth of booster coupling section |
hfc | 40.5 | Total height of booster including coupling section |
RB | 27 | Height of deployment bag |
DM | 114 (9.5 ft) | Diameter of the main parachute |
RM | 80.6 | Height of the main parachute (found using 0.707 aspect ratio): RM = DM*0.707 |
SM | 126 | Length of shroud lines on the main parachute |
DD | 34.4 (2.87 ft) | Diameter of the drogue parachute |
RD | 24.3 | Height of the drogue parachute (found using 0.707 aspect ratio): RD = DD*0.707 |
SD | 48 | Length of shroud lines on the drogue parachute |
Using these variables, a set of constraints was generated to ensure successful Recovery system deployment. The constraints are summarized in the table below:
Constraint | Description |
---|---|