5.3 Endurance Testing Scenarios

5.3.1 Integrated IDP External & Internal

The objective of this scenario is to run both IDPs concurrently for a protracted period of time (multiple days) to determine stbility and check for memory leaks.

5.3.1.1 Load Model

Desired Transaction Rate:  TBD

Script

% of Load

CAMS Account Creation

TBD

CAMS Association - OpenID

TBD

CAMS Association - Kerberos

TBD

Site Access - CAMS Account

TBD

Site Access - OpenID

TBD

Site Access - Kerberos w/ticket

TBD

Site Access - Web Auth

TBD

5.4 Fail-over Testing Scenarios

5.4.1 Integrated IDP External & Internal

The objective of this scenario is to check how both IDPs handle a sudden iteruption in connectivity by pulling the network plug from 1 of the servers (at a time)

5.4.1.1 Load Model

Desired Transaction Rate:  TBD

Script

% of Load

CAMS Account Creation

TBD

CAMS Association - OpenID

TBD

CAMS Association - Kerberos

TBD

Site Access - CAMS Account

TBD

Site Access - OpenID

TBD

Site Access - Kerberos w/ticket

TBD

Site Access - Web Auth

TBD

6.0 Monitoring

The following metrics will be collected from each Touchstone server during the performance tests to assit in diagnostics

...

8.1 Physical

Touchstone Production ArchitecturePhysical Architecture

8.2

...

IdPi Logical

Touchstone Production IdPi Logical Architecture

8.2

...

IdPe Logical

Touchstone Production IdPe Logical Architecture