5.3 Endurance Testing Scenarios
5.3.1 Integrated IDP External & Internal
The objective of this scenario is to run both IDPs concurrently for a protracted period of time (multiple days) to determine stbility and check for memory leaks.
5.3.1.1 Load Model
Desired Transaction Rate: TBD
Script | % of Load |
---|---|
CAMS Account Creation | TBD |
CAMS Association - OpenID | TBD |
CAMS Association - Kerberos | TBD |
Site Access - CAMS Account | TBD |
Site Access - OpenID | TBD |
Site Access - Kerberos w/ticket | TBD |
Site Access - Web Auth | TBD |
5.4 Fail-over Testing Scenarios
5.4.1 Integrated IDP External & Internal
The objective of this scenario is to check how both IDPs handle a sudden iteruption in connectivity by pulling the network plug from 1 of the servers (at a time)
5.4.1.1 Load Model
Desired Transaction Rate: TBD
Script | % of Load |
---|---|
CAMS Account Creation | TBD |
CAMS Association - OpenID | TBD |
CAMS Association - Kerberos | TBD |
Site Access - CAMS Account | TBD |
Site Access - OpenID | TBD |
Site Access - Kerberos w/ticket | TBD |
Site Access - Web Auth | TBD |
6.0 Monitoring
The following metrics will be collected from each Touchstone server during the performance tests to assit in diagnostics
...
8.1 Physical
Touchstone Production ArchitecturePhysical Architecture
8.2
...
IdPi Logical
Touchstone Production IdPi Logical Architecture
8.2
...